Site problems Milestone “C” Required Documents “16” Documents Required by Statute: 1. Acquisition Program Baseline (APB) 2. Analysis of Alternatives (AoA) 3. Benefit Analysis and Determination 4. Clinger-Cohen Act (CCA) Compliance 5. Competition Analysis 6. Consideration of Technology Issues 7. Cooperative Opportunities 8. Core Logistics/Source of Repair Analysis (SORAP) 9. Data Management Strategy (DMS) 10. DoD CIO Confirmation of CCA Compliance 11. Independent Cost Estimates (ICE) 12. Industrial Base Capabilities 13. Manpower Estimate 14. Milestone Decision Authority (MDA) Certification 15. Military Equipment Valuation 16. Program Environment, Safety, and Occupational Health Evaluation (PESHE) The documents are not filtered by Program ACAT. “25” Documents Required by Regulation: 1. Acquisition Decision Memorandum (ADM) 2. Acquisition Information Assurance Strategy 3. Acquisition Strategy (AS) 4. Affordability Assessment 5. Capability Production Document (CPD) 6. Component Cost Position (CCP) 7. Corrosion Prevention Control Plan 8. Cost Analysis Requirements Description (CARD) 9. Exit Criteria 10. Independent Technology Readiness Assessment 11. Information Support Plan (ISP) 12. Initial Capabilities Document (ICD) 13. Item Unique Identification (IUID) Plan 14. Life Cycle Signature Support Plan 15. Life Cycle Sustainment Plan (LCSP) 16. MDA Assessment of CBRN Survivability 17. Net Centric Data Strategy 18. Operational Test Agency Report of OT&E Results 19. Program Protection Plan (PPP) 20. Spectrum Supportability Determination 21. System Threat Assessment (STA) 22. System Threat Assessment Report (STAR) 23. Systems Engineering Plan (SEP) 24. Technology Readiness Assessment (TRA) 25. Test and Evaluation Master Plan (TEMP)