Site problemsMilestone “C” Required Documents“16”Documents Required by Statute:1.Acquisition Program Baseline (APB)2.Analysis of Alternatives (AoA)3.Benefit Analysis and Determination4.Clinger-Cohen Act (CCA) Compliance5.Competition Analysis6.Consideration of Technology Issues7.Cooperative Opportunities8.Core Logistics/Source of Repair Analysis (SORAP)9.Data Management Strategy (DMS)10.DoD CIO Confirmation of CCA Compliance11.Independent Cost Estimates (ICE)12.Industrial Base Capabilities13.Manpower Estimate14.Milestone Decision Authority (MDA) Certification15.Military Equipment Valuation16.Program Environment, Safety, and Occupational Health Evaluation (PESHE)The documents are not filtered by Program ACAT.“25”Documents Required by Regulation:1.Acquisition Decision Memorandum (ADM)2.Acquisition Information Assurance Strategy3.Acquisition Strategy (AS)4.Affordability Assessment5.Capability Production Document (CPD)6.Component Cost Position (CCP)7.Corrosion Prevention Control Plan8.Cost Analysis Requirements Description (CARD)9.Exit Criteria10.Independent Technology Readiness Assessment11.Information Support Plan (ISP)12.Initial Capabilities Document (ICD)13.Item Unique Identification (IUID) Plan14.Life Cycle Signature Support Plan15.Life Cycle Sustainment Plan (LCSP)16.MDA Assessment of CBRN Survivability17.Net Centric Data Strategy18.Operational Test Agency Report of OT&E Results19.Program Protection Plan (PPP)20.Spectrum Supportability Determination21.System Threat Assessment (STA)22.System Threat Assessment Report (STAR)23.Systems Engineering Plan (SEP)24.Technology Readiness Assessment (TRA)25.Test and Evaluation Master Plan (TEMP)