Site problems Milestone “B” Required Documents “22” Documents required by Statute: 1. Acquisition Program Baseline (APB) 2. Alternatel Live Fire T&E Plan 3. Analysis of Alternatives (AoA) 4. Benefit Analysis and Determination 5. Clinger-Cohen Act (CCA) Compliance 6. Competition Analysis 7. Consideration of Technology Issues 8. Cooperative Opportunities 9. Core Logistics/Source of Repair Analysis (SORAP) 10. Data Management Strategy (DMS) 11. DoD CIO Confirmation of CCA Compliance 12. Economic Analysis (EA) 13. Independent Cost Estimates (ICE) 14. Industrial Base Capabilities 15. Live Fire T&E Waiver 16. LRIP Quantities 17. Manpower Estimate 18. Market Research 19. Milestone Decision Authority (MDA) Certification 20. Program Environment, Safety, and Occupational Health Evaluation (PESHE) 21. Replaced System Sustainment Plan 22. Selected Acquisition Report (SAR) “27” Documents Required by Regulation: 1. Acquisition Decision Memorandum (ADM) 2. Acquisition Information Assurance Strategy 3. Acquisition Strategy (AS) 4. Affordability Assessment 5. Capability Development Document (CDD) 6. Component Cost Position (CCP) 7. Corrosion Prevention Control Plan 8. Cost Analysis Requirements Description (CARD) 9. DoD Component Cost Estimate (CCE) 10. Exit Criteria 11. Independent Technology Readiness Assessment 12. Information Support Plan (ISP) 13. Initial Capabilities Document (ICD) 14. Item Unique Identification (IUID) Plan 15. Life Cycle Signature Support Plan 16. Life Cycle Sustainment Plan (LCSP) 17. MDA Assessment of CBRN Survivability 18. Net Centric Data Strategy 19. Operational Test Agency Report of OT&E Results 20. Preliminary Design Review (PDR) Report 21. Program Protection Plan (PPP) 22. Spectrum Supportability Determination 23. System Threat Assessment (STA) 24. System Threat Assessment Report (STAR) 25. Systems Engineering Plan (SEP) 26. Technology Readiness Assessment (TRA) 27. Test and Evaluation Master Plan (TEMP) The Lists are not filtered by Program ACAT